Last launch jobs by area of boat bow to stern (front to back)
Fuel Tanks and Stabiliser Wings
- Fit rear tank hatches with fuel-proof rubber gaskets, bolt-closed
- Air pressure test both stabilizer wings, weld any issues
- Tap a clean thread for all underwater bungs
- Sort Portside back tank bung leak (move 2000 liters of diesel into starboard side tank first)
- Put water pump in cofferdam for water tank supply -plumb to galley (kitchen) and head (bathroom)
Wheelhouse
- Nav gear install finished
- Fasten down all IT gear
- Replace the steering wheel...oh yeah!
- Grip stuff on steps
- 2nd handrail attached to the stairs
- Youtube box bolted down - brackets if needed Clean up things into cardboard
Editing studio
- Bolt computers and IT gear down
Anchor Room
- Wire in the sump pump
- The Fit pump
Gally
- Make fiddles and attach
- Stow appliances
Saloon
- Stow everything Glass in storage
Hull
- Spot paint tire coat areas missed
- Bungs finished
- Anti-foul!
Below deck cabins and storage area
- Tidy up and stow boxes
Engine Room
- Fire extinguisher brackets bolted in
- Stainless steel shelf fiddle made and bolted
- Fuel transfer pump and pipes fitted, (transfer bull value needed) Accelerator bracket modified to suit new engine
- Weld water drain on S bend on exhaust (bung)
Engine Room Bonus
- Muffler made and installed
- Generator working and exhaust done
Prop / Rudder
- Seizing wire in prop
- Collar bolted and rudder bolts replaced (Buy bolts)
- Fit anodes on the rudder
- Replace grease after anti-fouling
Weld Jobs
- Corner wheelhouse underside
- Anodes back on x3
- Bungs in side deck air tanks
- Replace old welds on back deck roof x4 spot weld pinhole box section
- Portside round plates tig welded
- Half chain link x8 for life jacket net
Weld Jobs Bonus
- Cut out louvers in engine vents and weld-in panels
Misc
- Locks on gates
- Bench table on the back deck ?
- Lifejacket netting up
- Fasten exhaust shroud
- Insurance sorted
- Registration done
mipig6
kq5m2p